Inspection stages
Drawing review
Agree material, datums and critical features.
First article inspection
Review the initial part against the drawing.
Final inspection and packing
Check the finished part and agree packing requirements.
Agree the acceptance evidence
Identify the dimensions that control function and the records needed by your receiving team. An inspection report is more useful when its feature numbers match the drawing revision used for manufacture.
Project notesState whether acceptance applies before or after finishing, and which material, traceability or inspection documents should accompany the shipment.
Inspection records
| Drawing requirement | Record to agree |
|---|---|
| First article | Initial dimensional report |
| Critical features | Datum, measurement method and acceptance criteria |
| Finished parts | Final inspection and packing record |
Send Your 2D Drawing and 3D Model for Review
Use a 3D STEP file to show the part geometry and a dimensioned 2D drawing to specify tolerances. Include the material and quantity.
Request a QuoteInspection examples by feature
| Drawing requirement | Method to agree | Record to request |
|---|---|---|
| Hole pattern or contoured face relative to datums | For suitable accessible features, use a CMM with the agreed alignment and inspection points. | Feature number, nominal value, measured result and drawing revision. |
| Specified internal or external thread | Agree the thread designation, tolerance class and matching GO/NO-GO plug or ring gauge. | Record the gauge identification and acceptance result when required by the order. |
| Bearing bore or sealing land after finishing | Agree masking and coating allowance. Recheck the critical dimension in its delivered condition. | Identify the finished feature and the acceptance limit. Specify a separate leak test if sealing performance must be demonstrated. |
Mark these features on the drawing when requesting a quote. The measurement method, sampling and records are agreed for the order.




